Chery Insudtrial W50’xL100’xH23′ Double Truss Storage Shelter 26 OZ PVC Canvas Building Shelter. Truss Spacing 10 ft Arch Ø (mm) Ø60×1.8. Temperature Resistance -22 – +158 °F Tarp Lifespan 7-10 years .
T op cross brace: 16 Gauge 1″x1.8″ Galvanized Tube. Durable year-round construction: Built with rust-resistant galvanized steel and reinforced internal support structure, withstanding wind, rain, frost, and snow for all-season use.
40’x40’x15′ Outside Container Shelter Canopy | 22OZ PVC Double Truss| Industrial Storage Tent. 30’x40’x10′ Industrial Storage Shelter. Steel Structure High-Grade Hot Dip Galvanized Steel Truss Spacing 9.8 ft.
PVC cover. This is a heavier longer lasting cover than the standard 10.5 oz. The PVC material is superior in quality and durability and will last about twice as long as the standard 10 oz. Arch Spacing: 10 ft.
PVC cover. This is a heavier longer lasting cover than the standard 10.5 oz. The PVC material is superior in quality and durability and will last about twice as long as the standard 10 oz. Arch Spacing: 10 ft.
Truss Tube 16 Gauge Truss Spacing 8 ft. Weight(lbs) 7533 Tarp Lifespan 7-10 years . Superior All-Weather Defense: The shelter is protected by a heavy-duty PVC canopy, which is stronger and longer-lasting than standard PE material.
40’x40’x15′ Outside Container Shelter Canopy | 22OZ PVC Double Truss| Industrial Storage Tent. Steel Structure High-Grade Hot Dip Galvanized Steel Truss Spacing 9.8 ft. 40’x40’x15′ Industrial Storage Shelter.
W40xL80xH21′ Double Truss Gold Mountain Storage Shelter 22OZ PVC Canvas Building Shelter. Temperature Resistance -22 – +158 °F Tarp Lifespan 7-10 years . Man Door (WxH) 2.6’x6.6′ Truss Tube 16 Gauge. Truss Spacing 10 ft Purlin Ø (mm) Ø60×1.5.
Truss Spacing: 8 ft. Arch Ø (mm):Ø60×1.5 Purlin Ø (mm):Ø60×1.5 Snow Load: 42 lbs/ft² Wind Load:50 miles/h Temperature Resistance:-22 – +158 °F. Portable Freezer. Tool Storage. Door Size (WxH) (Front & Rear): 13.1’x13.1′ Man Door Size(WxH) :2.6 ‘x6.6 ‘.
30’ x 40’ x 22’ | Clear Span I-Beam Construction. Roof Pitch: 1:12. ✔️ Roof & Wall Steel Panels. 📐 Building Specifications. ✔️ Primary & Secondary Framing. ⚠️ Final engineering is based onjob site location, exposure, and local building codes.




